Dholera SIR Current Status

1st image

    Dholera Metro City Project Highlights & Opportunities-Dholera SIR

  • Total Area: 920 Sq. km.
  • Developable Area: 567.39 Sq. Km.
  • High Access Corridor: City Center, Industrial, Logistic, Knowledge & IT, Recreation & Sports, Entertainment.
  • World-class infrastructure & connectivity: within & outside.
  • Central spine express way & Metro Rail to link the SIR with mega cities.
  • Airport & Sea Port in the vicinity.
  • Proximity to mega cities: Ahmedabad, Bhavnagar, Vadodara.
  • Benefit of sea coast, nature park, golf course.
  • Premium civic amenities.
  • Capable to cater to both International & Domestic Market.
  • Close to Gujarat International Finance TechCity (GIFT).
  • Close to Petro-chemicals and Petroleum Inv. Region (PCPIR).
  • Logistic support of the Dedicated Freight Corridor (DMIC).
  • Benefits of the high impact Delhi Mumbai Industrial Corridor (DMIC).
  • Public investment in core infrastructure.

Dholera Special Investment Region Salient Features:

Empowered mechanism for administration

2nd image
  • Autonomy in operations.
  • Flexibility in decisions.
  • A self governed economic region enjoying full support of the
    government and full potential for private sector participation.
  • Freedom in planning.
  • Commitment to adopt best practices.
  • Full potential for private sector participation.
  • Fully developed environment & framework for PPP.
  • PSP modes : BOT, BOOT etc already operational.
  • To be linked with Ahmedabad city with metro rail system.
  • Proximity to sea port, Closeness to international airport.
  • Premium civic amenities.
  • Close to Gujarat International Finance City (GIFT).
  • Dispute Resolution mechanism .
  • Close to Petro-chemicals and Petroleum Inv. Region (PCPIR).
  • Single window clearance.

Dholera Smart City Projects

Connectivity Network

Boasting the second largest road network in the world, Dholera is not just connected with roadways but also rail and airways. With the approval of a Dholera International airport and the Metro Rail system that will link it directly to Ahmedabad city, Dholera SIR Project is making its way to the future.

Solar Power Plants

The 5000MW solar park planned to be set up at Dholera SIR Property will be the largest in the country and cater to the needs of commercial and industrial growth. The power plant will be generating from clean sources and is expected to generate 35 % - 40% of Tata’s total general capacity.

L&T Infrastructure

With the master planning assigned to Halcrow, trunk infrastructure to AECOM, ICT consultancy to Wipro, and technical solutions to IBM and CISCO; DSIR is set to create a whole new level of modern infrastructures with the help of reputed, big, and the best corporations out there.

Monorail Project

Signaled by our honorable Prime Minister Narendra Modi, the Dholera Monorail Project between Dholera and Ahmedabad is set to offer solutions to all connectivity hindrances and a distinct identity to the region in coming years.

TATA Lithium-Ion Battery Plant

TATA chemicals have acquired land and are planning to set up the biggest manufacturing plant for lithium-ion batteries in the city to compete against Chinese counterparts. The biggest consumers of these are the manufacturers of electrical vehicles and the biggest supplier of the same is China.

G-SER

The Gujarat Government and Cerestra Group signed MoU for establishing a world-class special education region (G-SER) in the city. Spread across a land of 1000 acres, this aims to provide quality education and attract foreign colleges and universities to set up their bases and collaborate on the courses provided here in Dholera.

Design & Construction of ABCD Building

The Contractor scope includes Design, Procurement, Construction, Installation, Testing and Commissioning of ABCD Building in Dholera.

M/s Cube Construction & Engineering Ltd

72.31

Completed

Image 1

Raw Water Transmission Main (RWTM – 10 MLD)

The Contractor scope includes Design, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 3 months and 5 year O&M of 10 MLD Raw water pumping station and Raw Water Transmission Main from Pipli Pumping Station (Pariyej Reservoir) to Water Treatment Plant at TP1 in Dholera SIR.

M/s D. R. Agarwal Infra Pvt Ltd

29.67

Completed

Image 1

Adhiya River Bunding Phase-1

Phase-I works of Flood Protection of Adhiya River between SH-06 and Khun village

M/s Jugalkishore Ramkishan Agrawal Pvt Ltd

11.87

Completed

Image 1

Interior Works of BEC Building

Interior Works of Business and Exhibition Centre (BEC) building in ABCD Complex in DSIR

New Concept

19.44

Completed

Image 1

Experience Zone at ABCD Building

The project vision is to create a state-of-the-art “Experience Zone” with Physical Model, Projection Mapping and display of the content on the digital wall. This Experience zone is located on the Ground floor of the BEC (Business & Experience Centre) Building at DSIR, Dholera, Gujarat. The model will be surrounded by the vision walls and other Dholera specific branding contents.

Tagbin

4.84

Completed

Image 1

Design & Construction of Roads & Services

The scope of work includes design and construction of the project roads and utilities/services like road network; Potable water supply network; Recycled water supply network; Sewage network; Industrial Effluent collection network; Storm water drainage network; RCC ducts for ICT network, Power supply network and crossings at junctions; Bridges and Outfall structures; Plot level Roads and Visual Branding elements etc.

M/s Larsen & Toubro Ltd

1801.07

Ongoing

Image 1

Canal Front Development Zone -2

Construction of Canal Front Development including Land Filling, Civil, MEP and Landscape (Zone 02) in Dholera Special Investment Region, Dholera

M/s P.R.Patel & Company

26.43

Completed

Image 1

Canal Front Development Zone -3

Construction of Canal Front Development including Land Filling, Civil, MEP and Landscape (Zone 03) in Dholera Special Investment Region, Dholera

M/s P.R.Patel & Company

14.99

Completed

Image 1

Service Area Buildings (with Porta Cabins)

Design, Procurement and Construction of 17 nos. of Service Area (With Porta Cabin), Operation and Maintenance of the project in conformity with the specifications & standards.

M/s Bridge & Roof Co. India Ltd

32.82

Ongoing

Image 1

Common Effluent Treatment Plant (CETP – 20 MLD)

The Contractor scope includes Design, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 3 months and 5 year O&M of 14 Intermediate Effluent Pumping stations , 1 Terminal Pumping station , 20 MLD Common Effluent Treatment Plant , RO reject disposal pipeline (12 MLD) from the RO reject tank to the outfall at Sukhbhadar creek, Master Balancing Reservoir- Recycled water (20 ML) & Pumping station for Recycled water (80 MLD)

M/s Larsen & Toubro Ltd

156.86

Ongoing

Image 1

Sewage Treatment Plant (STP – 10 MLD)

The Contractor scope includes Design, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 3 months & 5 year O&M of 6 Intermediate Sewage Pumping Stations , 1 Terminal Pumping station , 10 MLD Sewage Treatment Plant , 7.5 ML Master Balancing Reservoir and 70 MLD Pumping Station

M/s Larsen & Toubro Ltd

53.13

Ongoing

Image 1

Interior Works of SPV Building

Interior Works of Special Purpose Vehicle (SPV) building at ABCD Complex in DSIR

New Concept

15.58

Completed

Image 1

ICT MSI Project

Design, Supply, Install, Test, Integrate, Commissioning, Operation & Maintenance of ICT Components in Cluster A1 of Activation Area at Dholera.

M/s D. R. Agarwal Infra Pvt Ltd

68.99

Completed

Image 1

Earth filling in Selected Plots of Activation Area

Filling of Soil in Plot-A (70 Ha) and Plot-B (92 Ha) with average soil filling depth of 2.0m. The Scope of work pertain to clearing and grubbing of the project site of Plot A & B, Removal of unsuitable material from the project site and soil filling in the project site. Scope of work also includes temporary works for approach roads to project site. All work shall be carried out in accordance with the specification, drawings, BoQ and as per the direction of Employer’s representative.

M/s Montecarlo Ltd

86.01

Completed

Image 1

Balance Works of WTP (WTP – 50 MLD)

The Contractor scope includes review of designs already done and updation (if required), carry out all balance designs, Procurement, Construction, Installation, Testing, Commissioning, Trial Run of 2 months, 5 year O&M of 50 MLD Water Treatment Plant , Clear Water Reservoir (16.7 ML) , Clear Water Pumping Station (150 MLD), Potable Water Transmission Main (121.5 MLD) ,Master Balancing Reservoir (10 ML) & Potable water Pumping station (25.5 MLD).

M/s. MS Khurana Engineering Ltd

87.97

Ongoing

Image 1

Dholera SIR - Smart Industrial Townships Under DMIC

3rd image

Dholera Industrial City – The Scale – A City– Country

4th image

Dholera SIR - Activation Area Projects

5th image

Dholera SIR - Activation Area Projects

6th image
goolge icon